Cayuga Lake Water Intake
Underwater construction of major modifications to the Coal fired plants' raw water-cooling intake structure. Work included furnishing and installing a steel pipe pile foundation, 8' diameter steel manifold piping connecting the new 300-ton system to the existing intake pipe, as well as installation of four outer manifolds with 16 motorized self-cleaning Wedge-Wire Screens. All work was in 60' of water.
Owner: Cayuga Operating Co.